South Seas Marina, Captiva Island, FL
Project Details
Completed in February 2026, Phase 1 of the dock replacement project at South Seas Marina on Captiva Island, Florida, marked an important step in restoring the resort’s waterfront following severe hurricane damage. The existing fixed timber piers and utilities were replaced with a modern floating dock system that pairs heavy-duty performance with the finish expected of a premier resort marina. The installation features Marina Technologies’ System D-260 aluminum floating docks, equipped with composite decking, high-stability concrete floats and customized 18-inch adjustable powder-coated cleats.
Accommodating vessels up to 130 feet, the system was engineered for the hurricane wind and wave conditions that challenge Florida’s Gulf Coast. A distinctive feature of the project is its custom gangway design. During extreme high-water and storm-surge events, the gangways are designed to ride up onto the docks, allowing movement beyond their normal operating position and helping reduce the risk of damage. The completed first phase brings strength, stability and a refined appearance to South Seas Marina, creating a welcoming arrival for visiting boaters and resort guests alike. A first-class installation for a first-class resort.
Feature Product
The D-260 aluminum floating dock is engineered for large vessels up to 250 feet. With a reinforced double-track system, it provides exceptional strength, stability, and secure mooring even in exposed conditions. Learn more about its customizable dimensions, heavy-duty fittings, and mooring solutions built for high-performance marinas and commercial facilities.